India's Hydrocarbon Outlook Report - 2023-2024

India’s Hydrocarbon Outlook 2024 164 A Report on Exploration & Production Activities Basin Total No of PELs PEL Granted PEL Pending PEL Denied Andaman-Nicobar 6 6 0 0 Assam Arakan Fold Belt 17 16 1 0 Assam Shelf 31 29 2 0 Bengal-Purnea 6 5 1 0 Cambay 26 24 2 0 Cauvery 15 6 2 7 Cuddapah 1 1 0 0 Ganga-Punjab 4 4 0 0 Himalayan Foreland 1 1 0 0 Kerala Konkan 3 3 0 0 Krishna Godavari 10 4 1 5 Kutch 9 9 0 0 Mahanadi 10 10 0 0 Mumbai Offshore 9 9 0 0 Narmada 2 2 0 0 Rajasthan 16 16 0 0 Satpura-South RewaDamodar 1 1 0 0 Saurashtra 5 5 0 0 Vindhyan 5 5 0 0 Total 177 156 9 12 Basin 2D, LKM 3D, SKM Wells Drilled Andaman-Nicobar 8501 2131 Assam Arakan Fold Belt 1051 150 3 Assam Shelf 3001 496 2 Bengal-Purnea 904 1728 Cambay 1519 1760 15 Cauvery 0 5709 Cuddapah 0 221 Ganga-Punjab 0 597 Himalayan Foreland 0 0 Kerala Konkan 0 1028 ii. Actual Exploration Work Programme As on 31st March 2024, contractors of the blocks have acquired 31,467 LKM of 2D Seismic data and 33,705 Sq. km. of 3D Seismic data of CWP. A total of 52 wells have been drilled till FY 2023-24. Table 6.15: Basin-wise Status of PELs in OALP rounds Table 6.16: Exploratory work in OALP Blocks (As on 31st March, 2024)

RkJQdWJsaXNoZXIy MTE0OTM0OQ==