India's Hydrocarbon Outlook Report - 2023-2024

India’s Hydrocarbon Outlook 2024 80 A Report on Exploration & Production Activities In the basin, Satpura has Early Permian-toCretaceous play. South Rewa has Early Permianto-Cretaceous and Damodar Early Permian-toTriassic. In 3 subbasins of Satpura, South Rewa and Damodar, Aerial Yield method was used on analogy of Cooper Basin Satpura sub-basin has a total hydrocarbon in-place of 19 MMTOE and this is entirely undiscovered risked in- place. South Rewa sub-basin has a total hydrocarbon in-place of 39 MMTOE and this is entirely undiscovered risked in-place. Damodar sub-basin has a total hydrocarbon in-place of 3 MMTOE and this is entirely undiscovered risked in- place. Hydrocarbon prospectivity and Basin maturity: Basin datasets, studies and opportunities: As of 31.03.2024, NDR has archived data of 30,090 LKM 2D seismic, 550 SKM 3D seismic and 1,053 wells. Under various campaigns by GoI, geophysical data were acquired in onland area. Under National Seismic Programme (NSP), 1,142 LKM 2D seismic data were acquired. IIT-ISM, Dhanbad, India has completed an independent assessment of CBM potential. Central Mine Planning and Design Institute, Ranchi, India is at proposal stage for assessment of CBM potential including core hole drilling. Source: DGH Internal Source: DGH Internal Overview of producing fields: Commercial production in South Rewa subbasin commenced in 2011. Major producing fields with cumulative production in parenthesis are namely Sohagpur-West (2 BCM) The sub-basin has 2 fields with 364 wells. The maximum flow rates achieved by any field on record in 2023-24 is, Gas 0.7 MMSCMD. Commercial production in Damodar sub-basin commenced in 2008. Major producing fields with cumulative production in parenthesis are namely Raniganj-East (2.5 BCM), RaniganjSouth (1.7 BCM) The sub-basin has 5 fields with 558 wells. The maximum flow rates achieved by any field on record in 2023-24 is, Gas 1 MMSCMD.

RkJQdWJsaXNoZXIy MTE0OTM0OQ==